
01 / 04
Review
A fixed scope with a ranked gap list and the fix for each item. The usual first step: a health check or a 9-1-3 readiness review.
Services · Information management
In Dubai, the permit drawings for new buildings above the circular's thresholds must now be extracted from the BIM model. A model without managed information produces permit drawings you can't defend.
02 / Information management
ISO 19650 set up properly, then kept running. Work in progress, shared, published, archived: each move checked against ISO 19650 naming before it happens.
Register and title block · Sample project
03 / What you get
A readiness review checks your EIR, BEP and CDE set-up against the circular and ISO 19650-2. You get a ranked gap list with the fix for each item.
OIR, AIR and EIR written for your project, so appointed parties know what to deliver, in what form and when. Requirements trace back to a decision someone has to make.
Appointed parties' BEPs reviewed against your EIR. Each comes back accepted, accepted with comments or returned. A returned BEP lists the EIR clause it fails.
Containers move through 4 states: work in progress, shared, published and archive. We set up the CDE so each transition has an owner and a check. Naming follows the client's standard.
Monthly model and container audits: naming, status, revision, metadata and who moved what. Each month closes with a compliance report and a list of open items, each with an owner.
04 / Why it matters now
From 1 April 2026, Circular 9-1-3 requires BIM models for new buildings taller than Ground + 12 floors or with 15,000 sqm or more of built area. Permit drawings must be extracted from the model and match it.
Source: Dubai Municipality, Circular 9-1-305 / How engagements start

01 / 04
A fixed scope with a ranked gap list and the fix for each item. The usual first step: a health check or a 9-1-3 readiness review.

02 / 04
Information requirements written, or a controls structure and change register built, then handed to your team to run.

03 / 04
A senior planner assigned to your project. We direct and review the work; you receive the deliverables.

04 / 04
CDE administration and audits, or programme and register upkeep, with a monthly report.
Start here
a Primavera P6 export (.xer) and your notice, variation and extension of time registers.
the 14 DCMA checks, then notices, variations and extensions of time.
the findings ranked, each with its fix.